Wednesday, May 28, 2014

Wrapping up radiant tubing

Here are some final shot of the radiant tubing on the main level.  Here is the shot with all the sleepers completed.  This was a a lot of messing around to get here.  The wood sleepers are for screwing down the subfloor, and also to keep the concrete nice and level.

Great room:


Master bathroom was a bit of a contortionist pattern:



Then I got a crew of guys to do the pour as a side job.  Went very well.  A nice bunch of guys with a great sense of humor.


Great room progression:





Master suite and office:

After they left and the concrete set up a bit I took a flooring scraper and scraped off the tops of all the sleepers so they were nice and flat and clear for screwing down subfloor.  That was very tiring, but had to be done quickly before the concrete set up too much.  No pics of that, just making a mess..

At this point all the rough mechanicals are done and it is basically time for drywall.

No comments:

Post a Comment